Wage determination alerts
Predetermined increases, expirations, and award-lock checks. (Live SAM.gov / CA DIR auto-import is a go-live add-on.)
- NoteLocked at modification 3 as of award 2025-09-15. Verify no superseding modification applied before award.[CA20250012/3]
Contract
- Awarding body
- Federal Highway Administration / Caltrans
- Contract #
- DTFH-2025-C-0471
- Project #
- FED-08-I80-21
- DIR Project ID
- —
- Construction type
- highway
- Award date (locks WD)
- Sep 15, 2025
- CWHSSA covered
- Yes
- Location
- Roseville, Placer, CA
Wage determinations
The classification → base + fringe yardstick the engine validates against.
CA20250012 / mod 3highwayJan 3, 2025
General Decision — Heavy/Highway, Placer County.
| Craft / Classification | Base | Fringe | Total | Effective base | OT rule | Apprentice scale |
|---|---|---|---|---|---|---|
| Laborer / Group 1 | $32.5000 | $14.2500 | $46.7500 | $36.0000Base $32.5000 + Zone pay $3.5000 | 1.5×>40/wk | 60% / 70% / 80% / 90% |
| Operator / Group 4 | $45.0000 | $18.7000 | $63.7000 | $51.7500Base (Placer Zone A scale) $47.0000 + Zone pay $3.5000 + Shift differential $1.2500 | 1.5×>40/wk | — |
| Carpenter / Journeyman | $41.2000 | $16.9000 | $58.1000 | $44.7000Base $41.2000 + Zone pay $3.5000 | 1.5×>40/wk | 55% / 65% / 75% / 85% |